Boost logo

Boost :

From: Rene Rivera (grafikrobot_at_[hidden])
Date: 2007-11-05 15:24:43


David Abrahams wrote:
> That means establishing a 1.36.0 milestone

There's no need to create such a milestone. I created the "To Be
Determined" milestone. Which means that in addition to looking at the
tickets currently in the 1.35.0 milestone we need to look through the
ones in "To Be Determined" to see if any apply for this release. But
ideally I would rather see the bug handling to occur entirely outside
the 1.35.0 milestone since all the bugs should be getting fixed in the
trunk, not the release. Hence as a gross approximation we would move all
the 1.35.0 tickets to the "to be determined" milestone. And when a
library is placed in the branch we can move the resolved tickets only to
1.35.0.

-- 
-- Grafik - Don't Assume Anything
-- Redshift Software, Inc. - http://redshift-software.com
-- rrivera/acm.org - grafik/redshift-software.com
-- 102708583/icq - grafikrobot/aim - grafikrobot/yahoo

Boost list run by bdawes at acm.org, gregod at cs.rpi.edu, cpdaniel at pacbell.net, john at johnmaddock.co.uk