 
            
            
            
            
                24 Jul
                
                    2017
                
            
            
                24 Jul
                
                '17
                
            
            
            
        
    
                6:05 p.m.
            
        Le 24/07/2017 à 17:52, Steven Watanabe via Boost a écrit :
If you want to do other things while the build is running, then you should set the number of parallel jobs to something less than the number of cores, to leave some cycles free. You can even tweak it with: -l N do not start new jobs if the load average is greater than N