|
Boost-Build : |
Subject: [Boost-build] [unit test rules]
From: Thorsten Ottosen (thorsten.ottosen_at_[hidden])
Date: 2008-12-04 10:09:51
Hi,
I there any way I can make some unit-tests dependent on each-other?
Specifically I always want to run a certain unit-test before the current
unit-test.
Currently I have the following in my bjam file:
test-suite engine :
[ unit-test btp_algorithms : btp_algorithms.cpp bayesian ]
[ unit-test exhaustive_algorithms : exhaustive_algorithms.cpp bayesian
btp_algorithms ]
The idea here was that the unit tes "btp_algorithms" should be run first.
Thanks in advance
-Thorsten
Boost-Build list run by bdawes at acm.org, david.abrahams at rcn.com, gregod at cs.rpi.edu, cpdaniel at pacbell.net, john at johnmaddock.co.uk