|
Boost Testing : |
Subject: [Boost-testing] Oneshot fixture per test suit
From: Florian Lindner (mailinglists_at_[hidden])
Date: 2014-06-29 14:34:40
Hello,
is it possible to have a test fixture that is created once per test suite
and is destroyed after the last test of the test suite has been ran?
A test suite level fixture is created before each and every test, a global
fixture just once for the entire test programm.
Thanks,
Florian